Cendor Alpha 36" conductor and casing-hanger leak

Petrofac (Malaysia-PM304) · Cendor Alpha, offshore Malaysia · 2019

Problem & challenge

Gas seepage was observed at two conductors at the gap between the landing support ring and base plate above the 36-inch conductor, with suspected downhole channelling through casing-hanger seals.

Objective

  • Establish leak presence, path and severity at casing-hanger seal ports.
  • Eliminate visible gas seepage at the conductor section gap.

Solution

Diagnostics across casing-hanger seal ports, then a combined PAS and TAS treatment. Hyperwrap was introduced to secure the gap as a secondary barrier.

Result

All leaking casing-hanger seal ports were rectified. No further gas was observed at the section gap during soapy testing. The case is documented in SPE-202404-MS.