Skip to content
Hyperseal mark

Hyperseal Synteg

Optimize

Find the constraint. Unlock the production.

Hyperseal Synteg combines production engineering, candidate screening and specialist technologies to improve lift efficiency, manage flow-assurance restrictions and sustain production over the well lifecycle.

Discuss a Production Opportunity →

Production Challenges

What is limiting your production?

Many wells hold untapped potential — constrained by inefficient lift, wax and scale, emulsions, back pressure or simply underperformance. Removing the right constraint unlocks recoverable value.

Inefficient gas lift

Wax and paraffin deposits

Scale formation

Emulsions and asphaltene

High back pressure

Underperforming wells

Remove the constraint.
Recover the value.

Our Optimization Technologies

Three pathways. A stronger well.

Downhole gas-lift tool used to improve lift efficiency

Lift

LIFT: TRC Supersonic Gas Lift Enhancement

  • Improve gas lift efficiency
  • Increase drawdown and production
  • Through-tubing deployment
  • Proven field results
Production tubing restricted by wax and scale

Flow

FLOW: CPRS Wax & Scale Management

  • Remove wax and scale restrictions
  • Improved flow assurance
  • Applicable to oil and gas wells
  • Chemical and mechanical approaches
Microencapsulated production-chemistry beads

Protect

PROTECT: RYTE MicroEncapsulated Chemistry

  • Long-duration chemical protection
  • Controls paraffin, asphaltene, scale and corrosion
  • Autonomous, controlled release
  • Applicable to ESP, SRP, PCP, gas lift and more

Solution Selection

Engineering the right strategy.

Production history

VLP / nodal behaviour

Artificial lift configuration

Wax / scale / chemistry risk

Intervention access

Economics

Engineered Optimization Strategy

TRC

Lift

CPRS

Flow

RYTE

Protection

Our Approach

From potential to performance.

Data-driven.
Engineered.
Executed.
Measurable results.

  1. 01

    Screen

    Assess well data and identify constraints.

  2. 02

    Model

    Simulate and evaluate optimization scenarios.

  3. 03

    Select

    Recommend the right technology and plan.

  4. 04

    Deploy

    Execute with field support.

  5. 05

    Verify

    Measure results and optimize further.

Proven in the Field

Real wells. Real impact.

View Case Histories →
Gas processing plant and wellhead equipment

Barton Field, Sabah

TRC Gas Lift

Up to 40% production increase

Insulated and bare production piping

Regional Application

CPRS Wax & Scale

Reduced flow restrictions

Golden production-chemistry capsules

Permian Basin

RYTE Production Chemistry

305 days treatment · 29% cost reduction

Every Well Has a Constraint

Let’s find yours.

Discuss a Production Opportunity →