Field E control-line leak diagnostic & rectification

Control line

Field E control-line leak diagnostic & rectification

ExxonMobil Malaysia (EMEPMI) · Field E, offshore Malaysia · 2022

Field E control-line leak diagnostic & rectification

Problem & challenge

Two-way control-line leak communication. The line could not hold pressure, with gas ingress and pressure build-up. The insert-valve sealing system relied on swellable O-ring packing.

Objective

  • Seal the control-line leak in situ.
  • Reinstate control-line and TRSV functionality.

Solution

Diagnostics identified severe injectivity of 616 ml/min at 3,500 psi and pressure build-up of 305 psi in 30 minutes. Hyperseal deployed proprietary PAS by leak severity, continuously evaluated sealing, and installed an on-site back-pressure manifold to manage gas ingress.

Result

The control-line leak was sealed after positive and negative pressure testing. Gas blowout on bleed-off was eliminated, with flowtube movement and tubing inflow testing supporting reinstatement of control-line and TRSV functionality.