Field L remote well monitoring during infrastructure blackout

Production optimization

Field L remote well monitoring during infrastructure blackout

SapuraOMV · Field L, Offshore Sarawak

Field L remote well monitoring during infrastructure blackout

Problem & challenge

Newly completed wells required continuous pressure visibility during a 6–8 month infrastructure blackout period before jacket installation.

Objective

  • Maintain reliable remote well monitoring throughout the unattended period, including during monsoon conditions.

Solution

A remote monitoring system was installed together with Ex-rated solar panels and battery banks, providing an independent power supply for continuous data transmission.

Result

Continuous well pressure visibility was maintained throughout the blackout period, giving the customer reliable remote access to critical well data without permanent platform power.